June 22, 1944
384th Bomb Group Mission #143 & #144
Targets for the day: V-2 Storage & Launch Site in Wizernes, France & Railroad Marshalling Yards in Lille, France
384th Bomb Group Mission #143 & #144
Targets for the day: V-2 Storage & Launch Site in Wizernes, France & Railroad Marshalling Yards in Lille, France
Group Lead, B-17G 42‑97824 | Courtesy of Ken Decker and 384thBombGroup.com⇗
June 22, 1944: Exactly one year after their first combat mission, the 384th flew two missions as part of the post-D-Day missions. The targets for today were to hit secret rocket sites and disrupt German supply lines.
The Morning Mission: V-2 Rocket Sites (Wizernes, France)
14 aircraft flew this mission, each carrying two 2,000 pound bombs.
The Group Lead was B-17G 42‑97824⇗ with 1st Lt. Edward Lane (Commander)⇗ and 2nd Lt. Bert Strong (Pilot)⇗.
The day began with a briefing by Captain Frank S. Taylor⇗. He told the crews, "Bear in mind the fact that the Germans attach great importance to this area and may have reinforced it during the past few days since they began using their pilotless A/C. Defences at target consist of 24 heavy guns. There may be some additional mobile guns. You can expect meager to moderate flak halfway down your bomb run becoming intense at target. The low squadron can expect more than the others. Follow your evasive action carefully."
Captain Taylor also gave strict evasion instructions, saying, "If you are forced down, travel only at night. Stay under cover during the day and keep away from highways and railways at all times. Try to join our forces in France. Destroy your escape kit if about to be captured, and keep your mouth shut. Remember your name, rank and serial number. DON'T TALK."
Heavy cloud cover was encountered; however, 1st Lt. Lane noted in his narrative⇗ that “bombing was accomplished on 'GEE-H' equipment with fair results."
Although Captain Taylor’s warning at briefing seemed grim, the German forces were not as tough as expected.
Major William Dolan⇗ noted, "Flak at the target was very meager and inaccurate, causing no damage. No enemy aircraft were observed on the entire mission. One unidentified twin-engine enemy aircraft was observed in the distance on withdrawal but did not attack."
Two aircraft suffered bomb-bay malfunctions and returned to base without dropping their bombs, but the remaining 12 aircraft successfully dropped their bombs and returned safely. There were no injuries or losses on this mission.
The Afternoon Mission: Railroad Marshalling Yards (Lille, France)
By mid-afternoon, the 384th again took to the skies to cut off German supply lines. 24 aircraft flew this mission.
The Group Lead was again B-17G 42‑97824; this time, with Colonel Dale Smith (Commander)⇗ and 2nd Lt. Glenn June (Pilot)⇗.
At the mission briefing, Captain Charles Lloyd Moon⇗ warned the crews, "Enemy defences consist of 32 heavy guns at Lille, 12 at Courtrai, 24 at Menin, 8 at Roubaix, and 16 at Tournai. Flak can be expected to be meager to moderate at the coast to Frévent then moderate to intense into and at the target. Avoid Arras way in, skirt town of Tournai to avoid defences. On return stay clear of the coast, work inward and south, avoid Paris and large cities. Use your head and travel cautiously... DON'T TALK."
Chaos and delays were encountered.
Major George H. Koehne Jr. (Operations Officer)⇗ noted in his report⇗, "The Group assembly was difficult because of the poor assembly of the previous Wing. Division assembly was hindered by poor Wing formation of the 41st Combat Wing 'A' causing 'B' Combat Wing to run late. The route was flown as briefed, except for a slight deviation to avoid heavy clouds over the channel."
Cloud coverage continued to be an obstacle.
Major Joseph William Baggs (Lead Bombardier)⇗ noted in his report⇗ that the target “was quite hard to pick up because of scattered clouds covering the target area part of the time. The intervalometer would not release so was fraction of a second late to hit the salvo handle. Results were unobserved."
2nd Lt. John Isaac Barton (Lead Bombardier, Low Group)⇗ also had trouble with cloud coverage and mechanical problems of a different kind. He noted in his report⇗, "[The railroad yards] were hard to pick up every so often because of clouds. I synchronized on the target and bombs were away. During the bomb run, I had trouble with my oxygen, which gave a strong constant flow, which bothered me slightly. Results unobserved."
As briefed, the flak over Lille was aggressive.
Captain Phillip Nathan Bennett, Jr. (Low Section Leader)⇗ noted in his report⇗ that they "encountered moderate flak at the target, which seemed to be tracking the Lead Group, bursts coming immediately ahead of us."
Fortunately, no enemy fighters were encountered. And there were again, no losses or injuries on this afternoon mission.
Information courtesy of the 384th Bomb Group Mission Summaries #143⇗ and #144⇗, and Combat Mission Records and Plans: S-2 Briefing Notes⇗, by Capt. Frank Taylor, Group Leaders Narrative⇗ by 1st Lt. Edward Lane, Briefing Notes⇗ by Capt. Charles Moon, Transmittal of Summary Folder⇗ by Major George Koehne, Low Section Narrative⇗ by Capt. Phillip Bennett, and Lead Bombardier Report⇗ by Major Joseph Baggs and 2nd Lt. John Barton
Back, L-R: Sgt. Howard Dillon (Waist Gunner), Unidentified 1, 2nd Lt. Glenn June (Pilot), Maj. Joseph Baggs (Group Bombardier), 2nd Lt. James Martin-Vegue (Navigator), 2nd Lt. William M. Jackson (Navigator), 2nd Lt. Carlos Rabby (Observer/Tail Gunner)
Front, L-R: S/Sgt. William Aplin (Ball Turret Gunner), Col. Dale O. Smith (Commander/Co-Pilot), Unidentified 2, Unidentified 3
Not Identified: T/Sgt. Joseph Cicci (Radio Operator), T/Sgt. Svend Hansen (Top Turret Hunner), and S/Sgt. Carl Matthiesen (Radio Operator/Flexible Gunner) | Courtesy of 384thBombGroup.com⇗